FRAND Litigation Watch

Structure a FRAND negotiation in light of the case law.

The questionnaire places your negotiation against the steps courts examine, flags the comparables to study and the points to look into. No rate is calculated.

21 leading non-UPC decisions in the commented selection · all UPC decisions, without editorial selection · sources checked on 29 September 2026 · detailed case notes published on 11 October 2026 · database updated every week, on Friday · Corpus and method

Structure my negotiation

Put your FRAND negotiation in perspective

Identify what makes a licence comparable, what weakens a negotiation and which options deserve closer review. Three reasoned scenarios, without invented rates or coefficients.

  1. Answer the essential questions in a few minutes: your position, the right at stake, the timing and your objective.
  2. Complete the following sections if needed to refine the options.
  3. Receive a summary, the routes to examine and a downloadable orientation memo that you can share with the firm.

The engine applies explicit rules and does not predict a judgment. Your answers stay in your browser: the tool neither sends them to the firm nor stores them.

Enable JavaScript to use the questionnaire. The page’s analysis and sources remain accessible.

Working tool

Comparability grid for licences relied upon

A licence produced by a party serves as a comparison only once its scope, its structure and the circumstances of its conclusion are known. This grid records, criterion by criterion, what the document establishes, what it leaves open and the effect of the gap on comparability. It is not advice.

The twelve criteria
  1. Territorial scope
    To check in the document: Countries covered, exclusions, treatment of out-of-scope sales
    Effect if missing: The rate cannot be transposed to another territory without an explicit adjustment
  2. Technical scope
    To check in the document: Whole portfolio, named families, declared essential patents, non-essential patents included
    Effect if missing: Comparison distorted where the licence is broader than the portfolio in dispute
  3. Nature of the agreement
    To check in the document: Straight licence, cross-licence, litigation settlement, package including services or supply
    Effect if missing: Non-monetary consideration makes the apparent rate unusable as it stands
  4. Royalty structure
    To check in the document: Lump sum, per-unit rate, upfront payment, cap, floor, tiering
    Effect if missing: A nominal rate without its full structure says nothing about actual cost
  5. Volumes and term
    To check in the document: Licensed volumes, period covered, renewal, termination
    Effect if missing: A lump sum without volumes cannot be converted into a unit rate
  6. Level in the value chain
    To check in the document: Component, module or end-product maker
    Effect if missing: A licence concluded at another level is comparable only once the royalty base is justified
  7. Circumstances of conclusion
    To check in the document: Free negotiation, compliance with a ruling, settlement under threat of an injunction, global peace agreement
    Effect if missing: An agreement reached under procedural pressure does not necessarily reflect a market level
  8. Date
    To check in the document: Signature date, performance period, state of the portfolio at that date
    Effect if missing: An older agreement reflects neither portfolio nor market developments
  9. Currency and adjustments
    To check in the document: Currency, conversion used, indexation, withholding tax
    Effect if missing: The stated rate and the effective rate may differ
  10. Past sales
    To check in the document: Treatment of past use, amount allocated to earlier periods, waivers
    Effect if missing: Back payments mistaken for current royalties inflate the apparent rate
  11. Ancillary clauses
    To check in the document: Audit, default, most favoured licensee, non-challenge, assignment
    Effect if missing: These clauses shift economic value without appearing in the rate
  12. Access to the text
    To check in the document: Full text, extract, party-prepared summary, missing schedules
    Effect if missing: Without the full text and its schedules, comparability remains an assertion

Record a conclusion for each licence examined: comparable, comparable subject to an identified adjustment, not comparable, or comparability not verifiable on the documents disclosed.

Understand an issue

Key issues in FRAND negotiations

For standard-essential patents (SEPs), compare the requirements of a fair, reasonable and non-discriminatory (FRAND) licence. Choose a question to find relevant decisions and evidence to gather.

Commented international selection. 23 leading decisions, 2014 to 2026, from 10 legal systems, each with its practical reading and limitations. The selection is not exhaustive.

UPC decisions database. All UPC decisions classified SEP / FRAND, without selection, each with its record and the official decision: find a decision.

CROSS-JURISDICTION SYNTHESIS · EDITORIAL READING

Good faith is demonstrated through conduct.

A common reading of these cases is traceability: who explained an offer, responded, counter-proposed and enabled examination of the data? Economic substance and negotiating conduct need to be read together.

FTC/Qualcomm highlights the distinction between contractual FRAND duties and proof of competitive harm.

You hold the patents

Identify patents and alleged use. Explain the offer’s calculation and scope. Arrange proportionate access to confidential information.

You use the technology

Respond substantively and promptly. Explain disagreements. Document relevant counter-offers and security. A bare statement of willingness is fragile.

Differences and uncertainty

The tests differ: Article 102 TFEU in Europe, contractual obligations in the US and prima facie review in India’s Intex case. This corpus yields no universal response deadline.

What the decisions say

The jurisdiction filter selects the cards below. The synthesis above remains cross-jurisdictional. Systems without a reference for the selected question are disabled.

Germany · Sisvel v Haier05.05.2020 · Merits · appeal on points of lawWillingness must translate into negotiating conduct. The holder must also enable a FRAND agreement.

BGH · KZR 36/17 · grounds on willingness to conclude and on the portfolio
German judgment · WIPO Lex

Practical reading

Keep a chronology of responses and the rationale for portfolio scope.

Keep this limitation

The patent expired during proceedings: this judgment is not a new prohibitory injunction.

Open the source ↗ · Firm insight · Detailed case note

France · Conversant v LG16.04.2019 · Rate setting refusedThe court declines to set a royalty rate, the essentiality of the patents relied upon not being sufficiently established.

Paris Court of Appeal · official press release of 16 April 2019
Dhenne Avocats summary · docket number not confirmed in an official source

Practical reading

A request to set a rate first requires essentiality to be shown patent by patent. The declaration made to the standardisation body is not evidence, since ETSI does not verify essentiality.

Limit to keep in mind

The refusal rests on the proof of essentiality, not on any lack of jurisdiction.

Open the source ↗

France · Thales v Philips14.02.2023 · Appeal, evidence measureThe court upholds an ex parte evidence measure covering the licence negotiation record, the proof of negotiating conduct being at risk of disappearing.

Paris Court of Appeal, pole 5 ch. 16 (ICCP-CA) · RG 22/16659 · judgment published by the court
Dhenne Avocats summary · full text available

Practical reading

Negotiating conduct has to be proved. Exchanges, offers and counter-offers may be seized without a prior hearing, which shifts the stake towards the internal traceability of the discussions.

Limit to keep in mind

The judgment concerns evidence, not whether the terms discussed were FRAND.

Open the source ↗ · Detailed case note

France · TCL v Philips and ETSI06.02.2020 · JurisdictionThe Paris court accepts jurisdiction over claims based on a FRAND undertaking against a foreign patent owner, ETSI being domiciled in France.

Paris Judicial Court, 3rd ch. 1st sect. · RG 19/02085 · WIPO Lex record FR005-j
Dhenne Avocats summary · official source available

Practical reading

The French seat of the standardisation body gives implementers a route to Paris when they wish to have the FRAND undertaking enforced. The order treats that undertaking as a stipulation for the benefit of a third party, which gives the implementer a direct right.

Limit to keep in mind

The order rules on jurisdiction and admissibility, not on the financial terms of a licence.

Open the source ↗ · Detailed case note

France · Xiaomi v Philips and ETSI07.12.2021 · Jurisdiction and admissibilityThe court accepts jurisdiction over claims seeking the conclusion of a licence on FRAND terms, including on a worldwide basis.

Paris Judicial Court, 3rd ch. 3rd sect. · RG 20/12558 · INPI note, PIBD 1184-III-4, ref. B20210096
Dhenne Avocats summary · institutional source

Practical reading

Paris joins the fora that may entertain a request to set a worldwide licence. An implementer seeking to avoid a foreign forum has an interest in filing early, and the owner in anticipating that move in its negotiation sequence.

Limit to keep in mind

Accepting jurisdiction is not setting a rate. No French decision has so far determined financial terms on the merits.

Open the source ↗

United Kingdom · Panasonic v Xiaomi03.10.2024 · Appeal · interim-licence declarationsThe court grants interim-licence declarations and criticises pursuit of foreign injunctions in this setting.

Court of Appeal · [2024] EWCA Civ 1143 · §§ 86-102
Approved judgment · Sedona Conference reproduction

Practical reading

Compare each party’s English-court undertakings with its parallel-litigation strategy.

Keep this limitation

Both parties had undertaken to accept English-determined terms. This is not an anti-suit injunction.

Open the source ↗ · Detailed case note

United States · FTC v Qualcomm11.08.2020 · Merits appeal · antitrustThe antitrust judgment is reversed. An alleged FRAND contractual breach does not establish the asserted competitive harm.

Ninth Circuit · No. 19-16122 · pp. 35-40 and conclusion
Opinion text · Justia reproduction

Practical reading

Separate the contractual basis, relevant market and competitive harm.

Keep this limitation

The court does not decide the contractual duty to license chipmakers. No FRAND rate is set.

Open the source ↗ · Detailed case note

United Kingdom · InterDigital v Lenovo12.07.2024 · Merits appeal · global licence termsThe court corrects treatment of past sales in comparables and upholds interest on historic payments.

Court of Appeal · [2024] EWCA Civ 743 · §§ 209-224, 271-287
Public approved judgment · Bristows reproduction

Practical reading

Separate past sales, future sales, settlement discounts and the time value of deferred payment.

Keep this limitation

The adjustments are case-specific, not transferable coefficients.

Open the source ↗ · Detailed case note

United States · Ericsson v D-Link04.12.2014 · Merits appeal · damages and remandJury instructions must reflect the RAND commitment and distinguish inventive value from standardisation value.

Federal Circuit · 773 F.3d 1201 · II.B (Damages)
Converted judgment text · WIPO Lex

Practical reading

Support hold-up or royalty-stacking arguments with concrete evidence.

Keep this limitation

The first-instance award is disturbed: it is not an approved tariff for Wi-Fi devices.

Open the source ↗ · Detailed case note

China · Conversant v Huawei11.09.2020 · Reconsideration · litigation-preservation measureThe Supreme People’s Court maintains the restraint on Conversant seeking provisional enforcement of the German injunction.

SPC · (2019) 最高法知民终 732、733、734号之二 · grounds I, VI
Converted Chinese text · WIPO Lex. Firm’s FR/EN synthesis

Practical reading

Map how foreign enforcement affects the pending royalty-setting proceedings.

Keep this limitation

A restraint directed at a party, not annulment of the German judgment or global rate-setting.

Open the source ↗ · Detailed case note

European Union · CJEU · Huawei v ZTE16.07.2015 · Preliminary rulingA dominant holder must give infringement notice and, following willingness, make a reasoned written offer. The user must respond diligently. Counter-offer and security follow as appropriate.

CJUE · C-170/13 · §§ 60-71
Judgment text

Practical reading

Build an evidenced chronology of both parties’ communications and proposals.

Keep this limitation

The CJEU neither grants an injunction nor sets a rate. Validity and essentiality challenges remain possible (§ 69).

Open the source ↗ · Firm insight · Detailed case note

Germany · FRAND-Einwand III27.01.2026 · Merits appealThe BGH stresses continuing willingness and appropriate security promptly after rejection of a counter-offer. The defendant’s appeal is dismissed.

BGH · KZR 10/25 · grounds II.2, headnote 1a, 2
Reproduced judgment and judicial headnotes

Practical reading

An initial statement of willingness does not replace ongoing negotiating conduct.

Keep this limitation

This supplies neither a universal security amount nor a rule for every jurisdiction.

Open the source ↗ · Judicial headnotes ↗ · Detailed case note

UPC · Panasonic v Oppo22.11.2024 · First instance · meritsInjunction granted. Revocation dismissed. The latest offer and actual economic data are examined. A negotiating concession alone does not establish FRAND compliance.

Mannheim · UPC_CFI_210/2023 · §§ 221-227, operative part A.I, II, B
Judgment text

Practical reading

Document the economic rationale beyond the headline royalty.

Keep this limitation

Other relief was partly refused. One case does not define UPC-wide practice.

Open the source ↗ · Firm insight

UPC · Huawei v Netgear18.12.2024 · First instance · meritsInjunction granted with an exclusion for certain Qualcomm-modem products, subject to proof. Revocation dismissed. FRAND and IEEE defences fail in this dispute.

Munich · UPC_CFI_9/2023 · operative part B, C, J. Grounds G, H
Judgment text

Practical reading

Separate FRAND issues from exhaustion and product scope.

Keep this limitation

Limited injunctive relief is neither a complete win nor a general success rate.

Open the source ↗ · Firm insight

United Kingdom · Unwired Planet v Huawei26.08.2020 · Merits appealA global licence may be determined under the ETSI undertaking, backed by a UK patent injunction if refused. Comparables require reasoned adjustments.

UK Supreme Court · [2020] UKSC 37 · §§ 42-48, 90-93, 108-112
Judgment text

Practical reading

Distinguish global contractual scope from territorial patent rights.

Keep this limitation

This does not decide foreign patent validity. Non-discrimination does not automatically require the lowest available price.

Open the source ↗ · Firm insight · Detailed case note

United Kingdom · Optis v Apple01.05.2025 · Appeal · FRAND determinationThe first-instance simple average is criticised. The Court weighs the best comparables and uses a top-down cross-check to test the result.

Court of Appeal · [2025] EWCA Civ 552 · §§ 101-108, 137-145
Public judgment, partly redacted

Practical reading

Explain contract selection and test the robustness of adjustments.

Keep this limitation

Case-specific data and concessions do not provide a transferable formula. The public version is partly redacted.

Open the source ↗ · Firm insight · Detailed case note

Netherlands · Philips v Asus24.12.2019 · Merits appealThe FRAND defence fails for lack of genuine willingness. A Dutch injunction is granted. Broad access to third-party licences is refused in this setting.

The Hague · ECLI:NL:GHDHA:2019:3535 · §§ 4.168-4.193, operative part 5.1
Judgment text

Practical reading

Evidence willingness and target requests for disclosure of agreements.

Keep this limitation

This is not a general bar on obtaining comparable licences.

Open the source ↗ · Firm insight · Detailed case note

United States · Microsoft v Motorola30.07.2015 · Appeal · contractual liabilityThe RAND determination and liability for breach of good faith are upheld. Proposed comparable agreements are assessed in their economic context.

9th Circuit · 14-35393 · pp. 25-39, 40-47
Judgment text

Practical reading

An injunction strategy may also face contractual scrutiny.

Keep this limitation

A Washington-law contract action, not a single injunction test for every US court.

Open the source ↗ · Detailed case note

Japan · Samsung v Apple16.05.2014 · Appeal · damagesDamages above a FRAND royalty are held abusive in this case. FRAND-level compensation remains available. Willingness to license matters.

IP High Court · 2013 (Ne) 10043 · jugement, questions 6-7
Abridged English judgment translation

Practical reading

A FRAND commitment may constrain remedies without making use free of charge.

Keep this limitation

This judgment concerns damages. Related provisional proceedings are not counted as the same outcome.

Open the source ↗ · Detailed case note

India · Intex v Ericsson29.03.2023 · Appeal on interim reliefIntex is prima facie an unwilling licensee. Its appeal is dismissed and full payment of the relevant royalties is ordered at the interim stage.

Delhi High Court · FAO(OS)(COMM) 296/2018 and 297/2018 · §§ 118, 149-151
Judgment text

Practical reading

Prepare relevant essentiality, validity and comparability evidence at the interim stage.

Keep this limitation

The Court expressly reserves the merits. A payment order is not a sales injunction.

Open the source ↗ · Detailed case note

France · Lenovo v IPCom03.03.2020 · Interim-relief appealAccording to INPI, withdrawal of the US anti-suit request is upheld, while the blanket ban on further foreign applications is reversed.

CA Paris · RG 19/21426 · signalement INPI, note 1
Institutional summary · full text not checked

Practical reading

Identify the particular foreign procedure restricting access to the French court.

Keep this limitation

Secondary-level summary, excluded from outcome counts. Protection of court access is not a ban on all parallel litigation.

Open the source ↗ · Firm insight · Detailed case note

China · Oppo v Sharp19.08.2021 · Jurisdictional appealWIPO reports jurisdiction to determine global terms, based on Chinese connections and the intention to negotiate a global licence.

Supreme People’s Court · (2020) Zui Gao Fa Zhi Min Xia Zhong No. 517
WIPO informal summary · judgment unavailable

Practical reading

Map connections of the portfolio, business activities and negotiations.

Keep this limitation

This reference sets no rate and is not a full-judgment review. Excluded from outcome counts.

Open the source ↗ · Detailed case note

Germany · Sisvel v Haier II24.11.2020 · Merits · second appeal on points of lawWillingness to take a licence is assessed over time: a late counter-offer does not cure years of silence.

BGH · KZR 35/17 · FRAND-Einwand II
German text · WIPO Lex

Practical reading

Date every exchange: the court looks at conduct from the first notification, not only at the state of negotiations on the day proceedings were served.

Limit to keep in mind

Second instalment of the same dispute as Sisvel v Haier of 5 May 2020. The two judgments are read together, not one instead of the other.

Open the source ↗ · Detailed case note

Developments: three chronological reference points
  1. 2024 · JUB / UPC

    Panasonic and Huawei/Netgear provide two merits applications of the FRAND defence. Their outcomes remain specific to the offers, products and rights examined.

  2. 2025 · Optis v Apple

    Scrutiny of the comparison method is central: agreement selection, rejection of an unsupported average and a top-down consistency check.

  3. 2026 · BGH

    FRAND-Einwand III stresses continuing willingness and the timing of security. A German development to read within its own framework.

Selected developments, not a statistical trend. Subsequent appeals and events require checking for an actual matter.

All 61 decisions analysed in detail, by jurisdiction

Corpus, sources and reading method

The comparator contains 23 references: 21 decisions read as judgments or an abridged translation (Japan), and 2 clearly identified institutional summaries (France and China). Period: 16 May 2014-27 January 2026. An editorial selection, neither exhaustive nor representative of all worldwide case law.

Reading unit: one dated decision identified by court and number, copies, translations and multiple claims do not create additional cases. A decision may address several questions, so thematic counts must not be added. Additional worksheet references are not added to the comparator corpus.

Finding = reported holdingReading = editorial interpretationLimitation = what remains open

Relevant texts and passages were consulted. This is not an exhaustive procedural-status audit. Outcomes are historical. Institutional summaries are not used to code outcomes. No frequency, causation or success probability is inferred from this selection.

Syntheses are predefined editorial analyses selected by your question. The filter does not generate legal advice or search for new cases in real time. Worksheet answers remain in your browser.

Browse the existing international case records: International explorer. UPC documentary database.

Verified UPC outcomes: the small pilot corpus

These separate counts do not measure worldwide trends.

Verified pilot corpus

The materials and tools on this page, including any results they produce, are provided for general information. They do not constitute legal advice and create no relationship between the user and the firm. Assessing a FRAND negotiation or dispute requires an analysis of the record, the portfolio and the parties’ conduct. For advice on your situation, contact the firm.

Outcomes of the reviewed decisions

Two first-instance merits judgments, 22 November, 18 December 2024, selected from SEP/FRAND cases discussed on this site. Editorial selection of two disputes, neither exhaustive nor representative of all UPC cases.

2 / 2decisions dismissing revocation
2 / 2decisions finding at least some infringement
2 / 2decisions granting an injunction, one with an exclusion

Denominator: two decisions for each of the three indicators. No provisional or appeal decisions are included. These counts concern the identified issues, not an overall party success rate.

Panasonic v Oppo

Mannheim · 22.11.2024
UPC_CFI_210/2023

Revocation counterclaim dismissed. Infringement found. Injunction granted.

Operative part A.I, II, B. Some other relief was refused (A.VII): the overall result is not coded as a complete victory.

Read the decision text

Huawei v Netgear

Munich · 18.12.2024
UPC_CFI_9/2023 · ORD_598538/2023

Revocation counterclaims dismissed. Infringement found within the non-exhausted scope. Injunction granted with an exclusion.

Operative part B, C and J: certain Qualcomm-modem products are excluded subject to proof of first EU marketing. Counted once despite multiple defendants and counterclaims.

Read the decision text

Method, deduplication and limitations

Relevant reasons and operative parts reviewed on 28 September 2026. Unit: one dated judicial decision, identified by court, case number(s) and subject matter. Copies, translations, associated records, multiple defendants and cross-appeals disposed of together do not create additional observations.

Issue-level coding: revocation dismissed/allowed, infringement found/not found, injunction granted/refused, separately noting any limitation or undecided question. An injunction with an exclusion counts as granted, with that limitation displayed. No percentage or predictive probability is calculated from this small sample.

The outcomes describe the dated decisions. They do not establish present enforceability or the absence of later developments. The FRAND and Pharma corpora cover different periods and proceedings, so their counts are not directly comparable.

The broader documentary database

The UPC Litigation Watch database lists, under the topic “Standard-essential patents and FRAND”, every record classified under that heading (more than two hundred at 15 October 2026), the exact number and the date of the latest integration appear at the top of that database. These records are not the denominator of the outcomes above. The database covers decisions handed down since 1 June 2023. Full deduplication and outcome coding remain necessary before any overall statistics can be produced.

Browse the thematic records

Apply the case law to your matter

Need to assess a negotiation, an offer or a cross-border strategy? Dhenne Avocats advises on patent and FRAND disputes.

Discuss your matter · Our practice

Work and publications of Matthieu Dhenne: Kluwer Patent Blog, SSRN, Google Scholar, LinkedIn.

Latest analysis

Matthieu Dhenne on the Kluwer Patent Blog

Who maintains this watch

FRAND Litigation Watch is maintained by the Dhenne Avocats team, a Paris litigation boutique devoted to patent disputes. FRAND commitments and injunctions relating to standard essential patents are at the core of its work, regularly discussed at the Kluwer Patent Blog. References distinguish decisions from institutional summaries. The reading notes set out the firm’s editorial analysis and do not replace the cited text.


From the watch to the negotiation

No tool sets a FRAND rate. A rate is justified by a method, a scope and a complete negotiation record, and it must be defended before a judge. The firm acts in standard essential patent and FRAND litigation, provides a second opinion on pending litigation and works alongside negotiation teams, for patentees and implementers alike.


Frequently asked questions

What does FRAND Litigation Watch cover?

Decisions of the Unified Patent Court concerning standard essential patents and FRAND terms, put in perspective with the leading foreign decisions through the international case law explorer.

How does the UPC approach SEP disputes?

The case law is being built decision by decision, around the framework set by the Court of Justice in Huawei v ZTE and the assessment of the parties’ conduct in the negotiation. Each entry links to the official text of the decision.

Can a FRAND rate be computed automatically?

No. The tool on this page puts a negotiation in perspective. It replaces neither a valuation method, nor a portfolio analysis, nor a litigation strategy. For that, contact the firm.


Receive our articles and litigation updates

One newsletter a week, only when there is something new in the sections you choose, with a link to each article, each case note and the official source.

Sections (one or more)
Newsletter language

You will receive an e-mail asking you to confirm. Every newsletter includes a link to change your choices and an unsubscribe link.

Already subscribed: the “Manage my preferences” link appears at the bottom of every newsletter.