Polytechnik Luft- und Feuerungstechnik v Dall Energy (CoA, 29 June 2026)

Date29 June 2026
CourtCoA
DivisionLuxembourg (LU)
Type of actionAppeal RoP220.1
Case number(s)UPC_CoA_57/2026
Registry referenceUPC-COA-57/2026
PartiesPolytechnik Luft- und Feuerungstechnik GmbH v. Dall Energy ApS

Official decision (PDF) · UPC registry entry

Case timeline

Dhenne Avocats represents claimants and defendants in European patent disputes before the Unified Patent Court, including the Paris divisions.

Contact the firm

Dhenne Avocats · 10 October 2026

Our analysis

Summary

In an order of 29 June 2026 (UPC_CoA_57/2026), the Court of Appeal partly reverses the order for the production of evidence issued on 10 April 2026 by the judge-rapporteur of the Copenhagen Local Division in Dall Energy’s infringement action against Polytechnik (EP 2 334 762). Production is maintained for the complete construction drawings of the furnace at the Oberpullendorf site and for the operation and maintenance manuals relating to that furnace, but it is removed for drawings of furnaces supplied to other sites and for the open-ended category of « other materials » provided to customers. The order matters in practice because it sets out in general terms the framework of Art. 59 UPCA and Rule 190 RoP (plausibility, specificity, strict necessity and proportionality, paragraphs 19 to 32) and rejects two recurring objections: self-incrimination and the exclusion of external counsel from access to the documents.

Facts and procedure

Dall Energy, proprietor of a patent for a method of producing clean hot gas from solid fuel, sued Polytechnik for infringement before the Copenhagen Local Division (UPC_CFI_513/2025). On 10 April 2026 the judge-rapporteur ordered the defendant to produce, within two weeks and subject to a penalty, the complete drawings of the Oberpullendorf furnace, those of furnaces supplied to other sites, and the manuals and other materials given to customers, with access limited to the claimant’s representatives and their team. Polytechnik appealed on 20 April 2026, its request for suspensive effect was refused on 24 April 2026. It argued that the order was overbroad, unnecessary for a process feature (the drying-stage temperature), a fishing expedition, contrary to the privilege against self-incrimination and insufficiently protective of confidentiality (paragraphs 33, 45, 53, 55 and 62).

The applicable law

The Court recalls that Rule 190 RoP, read with Art. 59 UPCA and Art. 6 of Directive 2004/48, allows the production of specified evidence where the applicant presents reasonably available evidence supporting the plausibility of its claims, without having to prove infringement in full (paragraphs 19 and 25). The mechanism addresses information asymmetry without shifting the burden of proof (paragraphs 22 to 26). It excludes fishing expeditions (paragraph 27), requires evidence that is strictly necessary (paragraph 28) and a proportionate measure where no less burdensome means is available (paragraph 29), and calls for a fair balance with confidentiality (paragraphs 30 and 31). The appeal is admissible under Art. 73(2) UPCA and Rule 220.1(c) RoP (paragraph 18).

Question

Could the judge order production of the defendant’s entire technical documentation, including for installations other than the one at issue, and did the privilege against self-incrimination or the protection of confidential information stand in the way?

Decision

The Court accepts that an order for technical documents was justified in principle: the claimant relied on expert evidence and the defendant’s marketing material, and features F2.1.2, F7 and F7.1 of claim 1 were disputed (paragraph 35). The order was, however, excessive as regards other sites, since no relevant difference had been shown, and as regards « other materials », an indeterminate category (paragraphs 37 to 40). The defendant’s failure to produce counter-evidence cannot justify broader disclosure, as the burden of proof stays with the claimant, and confidentiality measures do not cure overbreadth (paragraphs 43 and 44). Drawings remain relevant to a process feature: evidence need not be conclusive on its own (paragraphs 46 to 52).

The self-incrimination ground fails: Art. 59(1) UPCA does not bar production of pre-existing documents merely because they may be adverse, the Court relying on the CJEU judgments in Otto and Orkem (paragraphs 56 to 59). Access by the opposing party’s representatives, with safeguards, complies with Art. 58 UPCA and Rule 262A RoP, excluding external lawyers and patent attorneys would impair the rights of the defence (paragraphs 64 to 70). Paragraph 1 of the operative part is replaced by an order limited to the drawings and manuals of the Oberpullendorf furnace. The order is otherwise upheld.

Key points for practice

Provisions applied

Agreement on a Unified Patent Court
Arts 54, 58, 59(1) and 73(2)
Rules of Procedure
Rules 190, 220.1(c) and 262A
Directive 2004/48/EC
Art. 6
Case law cited
Guangdong OPPO v Panasonic, Court of Appeal, 24 September 2024, Sun Patent Trust v Vivo, Court of Appeal, 26 January 2026, Ericsson v ASUSTeK, Court of Appeal, 26 January 2026, Daedalus Prime v Xiaomi, Court of Appeal, 12 February 2025, CJEU, Phoenix Contact (C-44/21), Castorama Polska (C-628/21), Mircom (C-597/19), Otto (C-60/92), Orkem (C-374/87), Varec (C-450/06), Meliá Hotels International (C-286/24)

Related decisions

Prepared by Dhenne Avocats from the official decision, consulted on 10 October 2026. The database is updated every week, on Friday. Only the official text is authoritative.


Decisions in the same proceedings

Going further

Lexicon: UPC Court of Appeal.

Dhenne Avocats blog: UPC Appeals: What the Numbers Show.

Source and translations

Official source
Unified Patent Court registry link recorded in the record
Original language
not recorded
Translation available
no translation recorded the firm’s French record is a summary, not a translation
Date checked
not recorded
Only the official text is authoritative. A machine translation is never presented as official, republishing a third-party document requires a verified basis in rights, and a link to the source is preferred.

Follow this case

Proceedings, related decisions, appeals, parties and patents as recorded in the registry and in the Dhenne Avocats corpus. Each link states its source.

Proceedings

  • UPC_CoA_57/2026 official number

Follow this case

First instance cited in the decision: UPC_CFI_513/2025

Parties

Exact name as it appears in the record, group affiliation only where sourced and dated.

Decisions in the same proceedings and documented appeals

  1. 24 April 2026 Polytechnik Luft- und Feuerungstechnik v Dall Energy (CoA, 24 April 2026) Application Rop 223 · UPC_CoA_57/2026

    L'effet suspensif est refusé : la production ordonnée n'est pas irréversible, les pièces pouvant être écartées du dossier, et le régime de confidentialité n'est pas utilement critiqué.

  2. 26 May 2026 Dall Energy v Polytechnik Luft- und Feuerungstechnik (CFI, 26 May 2026) Infringement Action · UPC_CFI_513/2025

    La défenderesse doit produire sous deux semaines les plans de ses fours et les manuels remis à ses clients, sous astreinte et avec accès réservé aux représentants. Un juge qualifié techniquement est demandé et l'audition en personne de deux témoins est refusée.

  3. 29 June 2026 Polytechnik Luft- und Feuerungstechnik v Dall Energy (CoA, 29 June 2026) Appeal RoP220.1 · UPC_CoA_57/2026 · appeal, first-instance number cited in the decision

What the record states

Nature of the act
Appeal RoP220.1
Outcome (Dhenne Avocats summary)
La cour d’appel limite l’ordonnance de production aux plans et manuels du four d’Oberpullendorf, la production étant excessive pour les autres sites et les « autres documents », et rejette les moyens tirés de l’auto-incrimination et de la confidentialité.
Appeal
Decision of the Court of Appeal (first instance cited: UPC_CFI_513/2025).
Instance
Court of Appeal decision.

Patents mentioned

Related decisions cited in the analyses

Scope: Dhenne Avocats corpus. Registry-based links are marked “official number”; links derived from the analyses are marked as such. An erroneous link can be withdrawn without deleting any record.

Patents and standards

PublicationRole in the disputeFamilyStandard and declarationPoolSources
EP 2 334 762Mentioned in the analysis (role not qualified)
Also mentioned in 2 other decision(s): Polytechnik Luft- und Feuerungstechnik v Dall Energy (CoA, 24 April 20 · Dall Energy v Polytechnik Luft- und Feuerungstechnik (CFI, 26 May 2026
not recordednot recordednot recordedEspacenet
links not checked
mentioned in: Dhenne Avocats analysis
The statuses “asserted in litigation”, “declared essential”, “listed by a pool” and “essentiality examined by a court” are distinct and may coexist. Validity, infringement and technical essentiality are different questions. Scope: patents cited in the decisions of the Dhenne Avocats corpus, with no essentiality score or prediction.

Receive an alert

Weekly summary of new records and substantive updates matching what you follow. Address confirmed by email, unsubscribe at any time, one email per week even where several of your follows match.

Follow

Weekly summary, on Fridays.