Opens in a new tab

SK nexilis v Volta Energy Solutions (CFI, UPC_CFI_706/2025, 23 October 2026)

Date23 October 2026
CourtCFI
DivisionMannheim (DE) Local Division
Type of actionInfringement Action
Case number(s)UPC_CFI_706/2025; UPC_CFI_1816/2025
Registry referenceUPC_CFI_706/2025
PartiesSK nexilis Co., Ltd. v. Volta Energy Solutions S.à r.l.; Volta Energy Solutions Europe Kft.; Volta Energy Solutions Hungary Kft.
LanguageEnglish

Official decision (PDF) · UPC registry entry

Dhenne Avocats represents claimants and defendants in European patent disputes before the Unified Patent Court, including the Paris divisions.

Contact the firm

Dhenne Avocats · 1 November 2026

Our analysis

Summary

In a decision of 23 October 2026 (UPC_CFI_706/2025), the Mannheim Local Division dismissed SK nexilis’ action against three Volta Energy Solutions companies for infringement of EP 3 316 363, which concerns an electrolytic copper foil for a secondary battery. The claimed roughness value is a count of peaks over the measured length, not a value normalised to 1 cm. The counterclaim for revocation, made conditional on a finding of infringement, is not decided, and the claimant bears its costs.

Facts and procedure

SK nexilis, a Korean copper-foil manufacturer, owns EP 3 316 363, in force in France, Germany, Italy, Luxembourg and Sweden. It alleged that Volta Energy Solutions S.à r.l., Volta Energy Solutions Europe Kft. and Volta Energy Solutions Hungary Kft. market foils falling within claim 1, which requires in particular a peak count roughness Rpc of 10 to 100 on each surface.

The defendants counterclaimed for revocation (UPC_CFI_1816/2025), conditional on a finding of infringement. The decision mentions parallel proceedings before the US District Court for the Eastern District of Texas. The oral hearing took place on 24 September 2026.

Question

How is the claimed Rpc value to be understood, and who bears the costs of a conditional counterclaim for revocation where infringement is rejected?

Decision

On construction, the Division holds that the claimed Rpc is the number of peaks counted over the measured length, without the normalisation to 1 cm that SK nexilis derived from the output of a measuring device. It refers to Court of Appeal case law on claim construction (Hefei v Grundfos, UPC_CoA_622/2025, para. 36; HUROM v Nuc, UPC_CoA_678/2025, para. 37). Infringement not being established, the action is dismissed, as is the request for production of evidence.

On costs, the Division holds that a conditional counterclaim for revocation is a direct consequence of the infringement action, since a defendant can only rely on invalidity by filing such a counterclaim. Its costs are not ‘unnecessary’ within Article 69(3) UPCA, contrary to the Munich Local Division on 13 January 2026. Where infringement is rejected, the claimant is the unsuccessful party in both proceedings, in line with the Paris Local Division (19 August 2026, UPC_CFI_301/2025, para. 99).

This applies at least where the condition is stated in the statement of defence or, at the latest, at the oral hearing before validity is argued on the merits. The Division leaves open the case of a condition introduced only after the Court’s preliminary opinion. SK nexilis is ordered to pay the costs agreed by the parties, EUR 1.1 million; the value in dispute is set at EUR 15 million for each action.

Key points for practice

Provisions applied

UPC Agreement
Articles 65, 69(1) and 69(3)
Rules of Procedure
Rules 25, 118.5 and 190
EPC
Article 69 and Protocol on its interpretation
Case law cited
Hefei v Grundfos (Court of Appeal, UPC_CoA_622/2025), HUROM v Nuc (Court of Appeal, UPC_CoA_678/2025), AorticLab v Emboline (Court of Appeal, UPC_CoA_40/2026, 17 August 2026), Fujifilm v Kodak (Court of Appeal, UPC_CoA_880/2025 and 882/2025, 2 June 2026), Munich Local Division (13 January 2026), Paris Local Division (UPC_CFI_301/2025, 19 August 2026).

Prepared by Dhenne Avocats from the official decision, consulted on 1 November 2026. The database is updated every week, on Friday. Only the official text is authoritative.


Going further

Lexicon: Claim construction, Counterclaim for revocation, Costs, Patent infringement action

Source and translations

Official source
Unified Patent Court registry link recorded in the record
Original language
English from the language of proceedings
Translation available
no translation recorded the firm’s French record is a summary, not a translation
Date checked
not recorded
Only the official text is authoritative. A machine translation is never presented as official, republishing a third-party document requires a verified basis in rights, and a link to the source is preferred.

Follow this case

Proceedings, related decisions, appeals, parties and patents as recorded in the registry and in the Dhenne Avocats corpus. Each link states its source.

Proceedings

  • UPC_CFI_706/2025 official number
  • UPC_CFI_1816/2025 official number

Follow these proceedings

Parties

Exact name as it appears in the record, group affiliation only where sourced and dated.

Decisions in the same proceedings and documented appeals

No other decision in the corpus bears the same case number, and no appeal is documented in the corpus to date.

What the record states

Nature of the act
Infringement Action
Outcome (Dhenne Avocats summary)
La division locale de Mannheim rejette l’action en contrefaçon de SK nexilis, constate que la condition de la demande reconventionnelle en annulation n’est pas remplie et met l’ensemble des frais, y compris ceux de la demande reconventionnelle conditionnelle, à la charge de la demanderesse.
Appeal
No appeal documented in the corpus, this does not mean that no appeal was lodged.
Instance
First-instance decision, whether it has become final is not recorded.

Patents mentioned

Scope: Dhenne Avocats corpus. Registry-based links are marked “official number”; links derived from the analyses are marked as such. An erroneous link can be withdrawn without deleting any record.

Patents and standards

PublicationRole in the disputeFamilyStandard and declarationPoolSources
EP 3 316 363Mentioned in the analysis (role not qualified)not recordednot recordednot recordedEspacenet
links not checked
mentioned in: Dhenne Avocats analysis
The statuses “asserted in litigation”, “declared essential”, “listed by a pool” and “essentiality examined by a court” are distinct and may coexist. Validity, infringement and technical essentiality are different questions. Scope: patents cited in the decisions of the Dhenne Avocats corpus, with no essentiality score or prediction.

Receive an alert

Weekly summary of new records and substantive updates matching what you follow. Address confirmed by email, unsubscribe at any time, one email per week even where several of your follows match.

Follow

Weekly summary, on Fridays.