Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Technologie (CFI, ORD_16018/2025, 14 April 2025)

Date14 April 2025
CourtCFI
DivisionMunich (DE) Local Division
Type of actionGeneric Order
Registry referenceORD_16018/2025
PartiesShanghai Jinko Green Energy Enterprise Management Co., Ltd., Zhejiang Jinko Solar Co., Ltd. v. LONGi Solar Technologie GmbH, Energy3000 solar …

Official decision (PDF) · UPC registry entry

Dhenne Avocats represents claimants and defendants in European patent disputes before the Unified Patent Court, including the Paris divisions.

Contact the firm

Dhenne Avocats · 10 October 2026

Our analysis

Summary

By procedural order of 14 April 2025 (UPC_CFI_119/2025, ORD_16018/2025), Judge-rapporteur Zigann of the Munich Local Division held that the statement of claim for infringement of EP 4 372 829, brought by Shanghai Jinko Green Energy Enterprise Management and Zhejiang Jinko Solar against six defendants including LONGi Solar Technologie, is deemed served by registered letter on Soltech Energy GbR (Defendant 4) on 14 March 2025, its statement of defence is due by 16 June 2025. The order treats failure to collect a registered letter as refusal to accept it.

Question

Does a registered letter notified to the addressee but not collected from the post office amount to service under Rule 271.6(b)?

Decision

The division applied the last alternative of Rule 271.6(b), under which service is deemed effected on the tenth day after posting where the addressee refused acceptance. Informed on 10 March 2025 that the document was awaiting collection at the post office, Defendant 4 did not collect it within the following two weeks and made no later enquiry: acceptance was therefore refused. As no notification under Rule 271.8 had been filed, service is deemed effected on the tenth day after posting on 4 March 2025, that is on 14 March 2025. The alternative request for service by other means (Rule 275) did not need to be addressed.

Key points for practice

Provisions applied

Rules of Procedure
Rules 271.6(b), 271.8 and 275
Case law cited
No UPC decision is cited.

Prepared by Dhenne Avocats from the official decision, consulted on 10 October 2026. The database is updated every week, on Friday. Only the official text is authoritative.


Going further

Lexicon: Written procedure (UPC), Court fees and costs (UPC).

Source and translations

Official source
Unified Patent Court registry link recorded in the record
Original language
not recorded
Translation available
no translation recorded the firm’s French record is a summary, not a translation
Date checked
not recorded
Only the official text is authoritative. A machine translation is never presented as official, republishing a third-party document requires a verified basis in rights, and a link to the source is preferred.

Follow this case

Proceedings, related decisions, appeals, parties and patents as recorded in the registry and in the Dhenne Avocats corpus. Each link states its source.

Proceedings

No case number recorded in this record.

Parties

Exact name as it appears in the record, group affiliation only where sourced and dated.

Decisions in the same proceedings and documented appeals

No other decision in the corpus bears the same case number, and no appeal is documented in the corpus to date.

What the record states

Nature of the act
Generic Order
Outcome (Dhenne Avocats summary)
La demande est réputée signifiée le 14 mars 2025 à la défenderesse 4, le défaut de retrait de la lettre recommandée valant refus. La défense est due le 16 juin 2025.
Appeal
No appeal documented in the corpus, this does not mean that no appeal was lodged.
Instance
First-instance decision, whether it has become final is not recorded.

Patents mentioned

Scope: Dhenne Avocats corpus. Registry-based links are marked “official number”; links derived from the analyses are marked as such. An erroneous link can be withdrawn without deleting any record.

Patents and standards

PublicationRole in the disputeFamilyStandard and declarationPoolSources
EP 4 372 829Mentioned in the analysis (role not qualified)
Also mentioned in 5 other decision(s): Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno · Zhejiang Jinko Solar v LONGi Solar Technologie (CFI, 29 July 2025) · Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno · Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno · Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno
not recordednot recordednot recordedEspacenet
links not checked
mentioned in: Dhenne Avocats analysis
The statuses “asserted in litigation”, “declared essential”, “listed by a pool” and “essentiality examined by a court” are distinct and may coexist. Validity, infringement and technical essentiality are different questions. Scope: patents cited in the decisions of the Dhenne Avocats corpus, with no essentiality score or prediction.

Receive an alert

Weekly summary of new records and substantive updates matching what you follow. Address confirmed by email, unsubscribe at any time, one email per week even where several of your follows match.

Follow

Weekly summary, on Fridays.