Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Technologie (CFI, ORD_16018/2025, 14 April 2025)
| Date | 14 April 2025 |
|---|---|
| Court | CFI |
| Division | Munich (DE) Local Division |
| Type of action | Generic Order |
| Registry reference | ORD_16018/2025 |
| Parties | Shanghai Jinko Green Energy Enterprise Management Co., Ltd., Zhejiang Jinko Solar Co., Ltd. v. LONGi Solar Technologie GmbH, Energy3000 solar … |
Official decision (PDF) · UPC registry entry
Dhenne Avocats represents claimants and defendants in European patent disputes before the Unified Patent Court, including the Paris divisions.
Dhenne Avocats · 10 October 2026
Our analysis
Summary
By procedural order of 14 April 2025 (UPC_CFI_119/2025, ORD_16018/2025), Judge-rapporteur Zigann of the Munich Local Division held that the statement of claim for infringement of EP 4 372 829, brought by Shanghai Jinko Green Energy Enterprise Management and Zhejiang Jinko Solar against six defendants including LONGi Solar Technologie, is deemed served by registered letter on Soltech Energy GbR (Defendant 4) on 14 March 2025, its statement of defence is due by 16 June 2025. The order treats failure to collect a registered letter as refusal to accept it.
Question
Does a registered letter notified to the addressee but not collected from the post office amount to service under Rule 271.6(b)?
Decision
The division applied the last alternative of Rule 271.6(b), under which service is deemed effected on the tenth day after posting where the addressee refused acceptance. Informed on 10 March 2025 that the document was awaiting collection at the post office, Defendant 4 did not collect it within the following two weeks and made no later enquiry: acceptance was therefore refused. As no notification under Rule 271.8 had been filed, service is deemed effected on the tenth day after posting on 4 March 2025, that is on 14 March 2025. The alternative request for service by other means (Rule 275) did not need to be addressed.
Key points for practice
- Practical point: an addressee that fails to collect a notified registered letter risks deemed service, and the time limit for the defence then runs against it.
Provisions applied
- Rules of Procedure
- Rules 271.6(b), 271.8 and 275
- Case law cited
- No UPC decision is cited.
Prepared by Dhenne Avocats from the official decision, consulted on 10 October 2026. The database is updated every week, on Friday. Only the official text is authoritative.
Going further
Lexicon: Written procedure (UPC), Court fees and costs (UPC).
Source and translations
- Official source
- Unified Patent Court registry link recorded in the record
- Original language
- not recorded
- Translation available
- no translation recorded the firm’s French record is a summary, not a translation
- Date checked
- not recorded
Follow this case
Proceedings, related decisions, appeals, parties and patents as recorded in the registry and in the Dhenne Avocats corpus. Each link states its source.
Proceedings
Parties
- claimantShanghai Jinko Green Energy Enterprise Management Co., Ltd.4 decisions in the corpusFollow this party
- claimantZhejiang Jinko Solar Co., Ltd.4 decisions in the corpusFollow this party
- defendantLONGi Solar Technologie GmbH4 decisions in the corpusFollow this party
- defendantEnergy3000 solarFollow this party
Decisions in the same proceedings and documented appeals
What the record states
- Nature of the act
- Generic Order
- Outcome (Dhenne Avocats summary)
- La demande est réputée signifiée le 14 mars 2025 à la défenderesse 4, le défaut de retrait de la lettre recommandée valant refus. La défense est due le 16 juin 2025.
- Appeal
- No appeal documented in the corpus, this does not mean that no appeal was lodged.
- Instance
- First-instance decision, whether it has become final is not recorded.
Patents mentioned
EP 4 372 829mentioned in: Dhenne Avocats analysis Follow this patent
Patents and standards
| Publication | Role in the dispute | Family | Standard and declaration | Pool | Sources |
|---|---|---|---|---|---|
EP 4 372 829 | Mentioned in the analysis (role not qualified) Also mentioned in 5 other decision(s): Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno · Zhejiang Jinko Solar v LONGi Solar Technologie (CFI, 29 July 2025) · Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno · Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno · Shanghai Jinko Green Energy Enterprise Management v LONGi Solar Techno | not recorded | not recorded | not recorded | Espacenet links not checked mentioned in: Dhenne Avocats analysis |
Receive an alert