Opens in a new tab

Topsoe v SYPOX (CFI, 26 August 2026)

Date26 August 2026
CourtCFI
DivisionDüsseldorf (DE) Local Division
Type of actionGeneric Order
Case number(s)UPC_CFI_1696/2025
Registry referenceUPC-CFI-0001696/2025
PartiesTopsoe A/S v. SYPOX GmbH, Josef Kerner Energiewirtschafts-GmbH

Official decision (PDF) · UPC registry entry

Case timeline

Dhenne Avocats represents claimants and defendants in European patent disputes before the Unified Patent Court, including the Paris divisions.

Contact the firm

Dhenne Avocats · 10 October 2026

Our analysis

Summary

By order of 21 August 2026 (UPC_CFI_1696/2025), the judge-rapporteur of the Düsseldorf Local Division ruled on the release to Topsoe of the experts’ detailed description drawn up after the inspection and preservation order of 25 and 26 November 2025, executed at SYPOX’s premises (EP 3 802 413, hydrogen production by steam methane reforming). She applied a three-step test and allocated the burden of showing relevance according to whether the expert relied on the information. For the H-200 installation, the balance favoured release, subject to a purpose limitation and a confidentiality club (paragraphs 108 to 112). The same method led, for the « Pilot 1 » installation, to a heavily redacted release, with several annexes withheld altogether. The judge also refused attorneys’ eyes only access and the deletion of the captured data, and set the time limit for the main action to run from actual release.

Facts and procedure

The inspection, ordered without hearing SYPOX, was carried out on 26 November 2025, the experts filed their detailed description on 30 December 2025. On a request for review under Rule 197.3 RoP, an order of 4 May 2026 upheld security of EUR 500,000 for opening the reactor and dismissed the remainder. SYPOX filed several redaction proposals and sought, as its main request, a reduced release, deletion of captured data and access limited to Topsoe’s external counsel (paragraphs 36 to 39).

The applicable law

Confidentiality may be raised independently of a request for review (paragraph 55). The division first asks whether the material is a trade secret, third-party personal data or other confidential information within Art. 58 UPCA, it then redacts confidential information irrelevant to infringement. Finally, it decides case by case whether relevant information is released under a confidentiality obligation or restricted to a defined group (paragraphs 56 to 59).

Question

Which parts of the detailed description and its annexes may be released to the applicant, and on what confidentiality terms?

Decision

Information the expert relied on is generally relevant, and the respondent must show otherwise. For other information, the applicant must show relevance, and information needed to understand the explanations as a whole may also be relevant (paragraphs 70 to 72). The « Pilot 2 » section, outside the order, was fully redacted by agreement (paragraph 60). For H-200, confidentiality was found and some annexes were redacted in whole or in part (paragraphs 61 to 107), for the rest, Topsoe’s interest in assessing infringement and deciding whether to bring a main action prevailed, SYPOX identifying no harm that the purpose limitation to main proceedings against the respondents and the confidentiality club would not address (paragraphs 110 to 112). For « Pilot 0 », the experts’ finding of non-infringement did not justify full redaction (paragraphs 114 to 118). The « Pilot 1 » installation falls within the inspection order (paragraphs 141 to 143), the related information is confidential, including what partners in the research project know, as they are bound by confidentiality undertakings (paragraphs 144 to 150). Figure by figure, the judge checked whether the expert relied on it: material used was released, the argument that infringement could have been shown another way being irrelevant, while data whose relevance was not specifically shown (reactor dimensions, syngas composition, certain parameters) were redacted (paragraphs 151 to 244). Annexes the expert only quoted in extracts (reformer and reactor drawings, data sheets, an order confirmation, measurement data, photographs) were not released beyond those extracts (paragraphs 201 to 244). Release is subject to the same purpose limitation and confidentiality club (paragraph 245). The confidentiality obligation in the inspection order continues and extends to information gathered outside its subject matter (paragraphs 246 to 249). Deletion of data was refused, the experts’ duty of secrecy being sufficient (paragraphs 250 and 251). Attorneys’ eyes only access was rejected: Rule 262A.6 RoP requires access for at least one natural person of each party unless the other side agrees, which also applies to inspections (paragraphs 252 and 253). The operative part requires SYPOX to upload the redacted versions by 4 September 2026, invites Topsoe to name the authorised persons by the same date, withholds annexes D1 to D12 (« Pilot 2 »), D13, D15 and D16 (« H-200 ») and L2, L3, L4, L5, L6, L8 and L12 (« Pilot 1 »), limits use of the results to main proceedings against the respondents and recalls that the measures lapse unless a main action is brought within 31 calendar days or 20 working days of release (paragraphs 254 and 255).

Key points for practice

Provisions applied

Agreement on a Unified Patent Court
Arts. 27(b), 58 and 60(8)
Rules of Procedure
Rules 194(d), 196, 196.2, 197, 197.3, 198.1, 199, 199.2, 262A and 262A.6
Other provisions
TRIPS Agreement, Art. 39(2)
Case law cited
Bekaert v Siltronic, Düsseldorf Local Division, 19 November 2025 (UPC_CFI_539/2024), Progress Maschinen & Automation v AWM, Court of Appeal, 23 July 2024 (UPC_CoA_177/2024), Strabag v Swarco, Court of Appeal, 1 August 2025 (UPC_CoA_70/2025), Organon Heist v Genentech, Brussels Local Division, 12 November 2025 (UPC_CFI_407/2025), Van Loon Beheer v Inverquark, Düsseldorf Local Division (UPC_CFI_1325/2025), Ericsson v ASUSTek, Court of Appeal, 26 January 2026 (UPC_CoA_631/2025), Yangtze Memory v Micron, Düsseldorf Local Division, 17 August 2026 (UPC_CFI_1034/2025)

Related decisions

Prepared by Dhenne Avocats from the official decision, consulted on 10 October 2026. The database is updated every week, on Friday. Only the official text is authoritative.


Decisions in the same proceedings

Going further

Lexicon: Written procedure (UPC), Court fees and costs (UPC).

Source and translations

Official source
Unified Patent Court registry link recorded in the record
Original language
not recorded
Translation available
no translation recorded the firm’s French record is a summary, not a translation
Date checked
not recorded
Only the official text is authoritative. A machine translation is never presented as official, republishing a third-party document requires a verified basis in rights, and a link to the source is preferred.

Follow this case

Proceedings, related decisions, appeals, parties and patents as recorded in the registry and in the Dhenne Avocats corpus. Each link states its source.

Proceedings

  • UPC_CFI_1696/2025 official number

Follow this case

Parties

Exact name as it appears in the record, group affiliation only where sourced and dated.

Decisions in the same proceedings and documented appeals

  1. 25 November 2025 Topsoe v SYPOX (CFI, 25 November 2025) Application for an Order for inspection pursuant to RoP199 · UPC_CFI_1696/2025

    La division autorise sans audition et sans garantie l'inspection des installations de production d'hydrogène de SYPOX et de leur documentation technique sur trois sites, avec copie de documents, ouverture du réacteur et export des données, les mesures les plus intrusives n'étant accordées qu'à titre subsidiaire.

  2. 26 November 2025 Topsoe v SYPOX (CFI, 26 November 2025) Application for an Order for inspection pursuant to RoP199 · UPC_CFI_1696/2025

    Le dispositif de l'ordonnance d'inspection du 25 novembre 2025 est rectifié quant aux adresses des défenderesses et du site de production. Il est maintenu pour le surplus.

  3. 4 May 2026 Topsoe v SYPOX (CFI, 4 May 2026) Generic Order · UPC_CFI_1696/2025

    La division rejette la récusation des experts et les demandes d'exclusion de leur description, rejette le réexamen de l'ordonnance d'inspection, maintient la garantie de 500 000 euros préalable à l'ouverture du réacteur et autorise l'appel.

  4. 26 August 2026 Topsoe v SYPOX (CFI, 26 August 2026) Generic Order · UPC_CFI_1696/2025
  5. 12 October 2026 Topsoe v SYPOX (CFI, 12 October 2026) Generic · UPC_CFI_1696/2025

    Saisie d’une demande de réexamen fondée sur la règle 333, la division locale de Düsseldorf juge que la divulgation relative à l’installation Pilot 1 entrait dans le champ de l’ordonnance d’inspection initiale et maintient l’ordonnance de la juge-rapporteure du 21 août 2026.

What the record states

Nature of the act
Generic Order
Outcome (Dhenne Avocats summary)
La juge rapporteure de la division locale de Düsseldorf organise la communication à Topsoe de la description détaillée issue de l'inspection selon un test en trois étapes, occulte les informations confidentielles non pertinentes, refuse plusieurs annexes et un accès réservé aux conseils, et communique le reste sous limitation d'usage et cercle de confidentialité.
Appeal
No appeal documented in the corpus, this does not mean that no appeal was lodged.
Instance
First-instance decision, whether it has become final is not recorded.

Patents mentioned

Related decisions cited in the analyses

Scope: Dhenne Avocats corpus. Registry-based links are marked “official number”; links derived from the analyses are marked as such. An erroneous link can be withdrawn without deleting any record.

Patents and standards

PublicationRole in the disputeFamilyStandard and declarationPoolSources
EP 3 802 413
Hydrogen production by steam methane reforming
recorded proprietor: Topsoe AS
Mentioned in the analysis (role not qualified)
Also mentioned in 8 other decision(s): SYPOX v Topsoe (CFI, 27 August 2026) · SYPOX v Topsoe (CFI, 27 July 2026) · Topsoe v SYPOX (CFI, 4 May 2026) · HyGear v Topsoe (CFI, 20 March 2026) · Topsoe v SYPOX (CFI, 10 December 2025) · Topsoe v SYPOX (CFI, 26 November 2025) · Topsoe v SYPOX (CFI, 25 November 2025) · Topsoe v SYPOX (CFI, 12 October 2026)
not recordednot recordednot recordedEspacenet · European Patent Register
existence and title of the publication checked on 30 October 2026 (Google Patents, Espacenet and Register links are not checked automatically)
mentioned in: Dhenne Avocats analysis
The statuses “asserted in litigation”, “declared essential”, “listed by a pool” and “essentiality examined by a court” are distinct and may coexist. Validity, infringement and technical essentiality are different questions. Scope: patents cited in the decisions of the Dhenne Avocats corpus, with no essentiality score or prediction.

Receive an alert

Weekly summary of new records and substantive updates matching what you follow. Address confirmed by email, unsubscribe at any time, one email per week even where several of your follows match.

Follow

Weekly summary, on Fridays.